project information
Status Completed
Design
Project Manager PPS Design Co.,Ltd.
Site location
Detail - Distance over all 733.80 m.
- Fly over Prachachuen Road and Klong Prapa to Rachadapisek Inbound Road
- Pavement wide 6.00 m.
- U-Channel fly over bridge total length 194.50 m.
- Transition Units total length 140.433 m.
- Rigid Pavement 209.763 m.
- Bore pile 1500 mm. 12 nos.
- Bore pile 1800 mm. 2 nos.
- Driven pile 305 x 350 mm. 236 nos.
Project Duration October 2004 to July 2005